Contact us

Mobile: 13510720996

Email: sales@chinaroller.com

Website: www.chinaroller.com

Integrity: https://szxds123.1688.com

Common problem
Your location:Home >News >

What is the operation process of the unpowered drum?

  In fact, many customers are not familiar with the operation process of the unpowered cylinder when they operate it. The unpowered cylinder is widely used on the assembly line. If the operation is not standardized, it is easy to delay the subsequent transmission work. What is the operation process of the unpowered cylinder?

无动力滚筒

  

1. Before starting the unpowered drum, the equipment needs to be overhauled, and if any error is found, it needs to be adjusted in time.

2. Debugging the unpowered drum is actually what we call trial run.

3. After the unpowered drum operates normally, check whether the belt is deviated. If it is normal, the subsequent operation can be continued. If the belt is deviated, it needs to be adjusted immediately.

4. The operator should always check the temperature of the unpowered drum, and if the temperature is abnormal, stop the machine for maintenance in time.

5. After the transportation, stop the machine for maintenance, clean up the residues on the conveyor belt, and keep the environment around the drum clean.

The operation process of the unpowered drum is an important part of the whole transportation link. To ensure the service life of the unpowered drum and reduce unnecessary failures, correct operation of the unpowered drum is a lot of ways.

>>Return
Shenzhen Xingdeshun Machinery Equipment Co., Ltd Copyright   Yue ICP Bei No. 09077024   Site Map Technical support:SZTD